欧美成人精品一区二区男人小说,美媛馆国产精品一区二区,亚洲成人av一区二区,欧美momandson

???? SSI ????????
???? SSI ????????
???? SSI ????????
???? SSI ????????
2009-5-19 16:34:11PRINT

Updating Mechanical Press with Hydraulic Press

The new lead-off press supplied by Schuler was installed at Ford in just 36 days

Gently applying extreme forces to sheet metal ?C this is the art of deep drawing. When it comes to the complex forming of car body parts, more and more manufacturers are now using hydraulic draw cushions ?C so too Ford??s facility in Saarlouis, Germany. As the mechanical lead-off press of a six-stage press line for the production of large body parts had grown old and was causing increasing problems, corporate management in Cologne and local management at the Ford Saarlouis stamping plant decided for a change in technology. For the first time, they opted for an hydraulic over a mechanical line for this decisive part of the production process with enormous influence on productivity and quality. The new hydraulic press supplied by Schuler has now been operating reliably for around 250 days. The production launch took just 36 days.

The new hydraulic deep drawing press of Schuler SMG in Waghäusel, Germany, replaced a line which had seen 35 years of service.  As a consequence, the press force had already been reduced from 1,000 to 800 metric tons.

??The new more powerful Schuler line has a press force of 2,250 metric tons and can also process high-strength steels,?? says Manuel Pleitgen, Project Manager at Schuler SMG in Waghäusel. Ford uses such high-grade materials, for example, in floor panels for its Mondeo, S-MAX and Galaxy models. Such materials were previously processed by external suppliers. ??With the new press, we can now handle these orders ourselves,?? states Werner Scholl.

The press was installed and put into operation in the record time of just 36 days. Hans-Josef Richner, of Ford??s Corporate Press and Installation Technology division in
Cologne, states: ??We have never experienced such a smooth production launch.?? And his colleague Robert Steier of Ford??s Factory Planning division, adds: ??The lead-off press is running trouble-free and was soon able to reach the required cycle time of eight seconds.?? Up to twelve large parts can be produced per minute in highest deep draw quality.

In two-shift operation, the new hydraulic lead-off press supplies large body parts ?C such as roofs, side walls, floor panels and fenders ?C for the Ford models Focus and Focus C-Max produced in Saarlouis. With its more powerful lead-off press, the plant can also produce panels for other German and European facilities and help out in the case of capacity bottlenecks.

Weighing 500 metric tons and measuring over ten meters in height, the giant machine boasts a total press force of 2,250 metric tons. The die-clamping surface measures 4,600 x 2,500 millimeters, the slide stroke 1,950 millimeters, and the maximum drawing depth 350 millimeters. The crown weighs 115 metric tons, the press bed 90 metric tons, and the slide and blank holder 50 metric tons.

Other information

???? SSI ????????
???? SSI ????????
主站蜘蛛池模板: 会泽县| 沾益县| 灵寿县| 罗田县| 扎鲁特旗| 高雄市| 玉树县| 颍上县| 大竹县| 临潭县| 和平区| 克山县| 广丰县| 安化县| 宁津县| 大悟县| 井冈山市| 荆州市| 乾安县| 商水县| 永城市| 剑阁县| 洛扎县| 汉中市| 武冈市| 岢岚县| 得荣县| 五大连池市| 昌邑市| 黄梅县| 通河县| 吴忠市| 永德县| 遂昌县| 安平县| 理塘县| 平度市| 稻城县| 依安县| 磐安县| 噶尔县|